With threaded horizontal port inlet,outlet and vent/test connection on the lefthand side.The venting bonnet is positioned on the top and the isolating bonnet on the front.
Standard connection
Product |
Process side |
Instrument side |
Vent/Test |
2VM |
1/2"NPT female |
1/2"NPT female |
1/4"NPT female |